![Pre-excavation grouting for groundwater ingress control in tunnelling – Auckland, New Zealand.](https://www.nzgs.org/wp-content/themes/nzgs-by-futurelab/theme/assets/thumbnail-placeholder.png)
Pre-excavation grouting for groundwater ingress control in tunnelling – Auckland, New Zealand.
Abstract Water ingress into a mined tunnel can be an issue – not just for construction but also for depressurisation and the potential consequential surface settlement. The Waterview Connection in Auckland has twin ~14.5m diameter TBM tunnels linked by 16 mined cross passages. Each cross…