Skip to content

Author

Construction specification for bored and driven piles

This Specification sets out requirements for the construction of bored or driven pile types. This document is published in collaboration by the Structural Engineering Society New Zealand (SESOC) and the New Zealand Geotechnical Society (NZGS). This document supersedes the Auckland Structural Group publication “Piling Specification”…

Tauranga Harbour Link foundation pile construction and testing

Tauranga Harbour Link foundation pile construction and testing

The Tauranga Harbour Link project represents a major upgrade of the existing harbour crossing and approaches. It comprises a two lane incrementally launched bridge and major viaduct structure spanning road and rail links. This paper presents the details of the pile construction methodology using bentonite…