Northport Berth 3 design and construction monitoring

Berth 3, an extension to Northport Ltd’s Marsden Point wharf facility, comprises a twin sheet pile wall to provide support to the new wharf deck and retain the adjacent reclamation. The wall type was selected to enable construction to proceed by walking a crane over the constructed wall, negating the need to use a large floating or jack up barge. The wall structure comprises twin king piles and intermediate sheet piles, 12.5m apart tied with steel bars at two levels and reinforced concrete deck top.

Design was undertaken using finite difference software FLAC to predict displacement, movement, shear and anchor loads during various stages of construction. Deflection monitoring of the wharf performance was undertaken with survey and inclinometers. This paper describes the FLAC modelling for design of the twin wall and compares monitoring results from the performance of the wall both during construction and one year following completion with predicted displacements.

Tags : #Case history#Monitoring#Retaining walls#Sheet piles#Wharf

Downloads
14-3.pdf
Published
09/01/2008
Collection
NZGS Symposium
Authors(s)
N/A
Compilation
NZGS Symposium>18th NZGS Symposium
Link
N/A
Issue
1
Volume
34
Version
N/A
Location
N/A
Type
Paper
Tags
N/A
ISBN
ISSN
0111-9532

Leave a Reply