Skip to content

Location

Earthquake Geotechnical Engineering Module 1 – Overview of the guidelines

These guidelines for Earthquake Geotechnical Engineering Practice in New Zealand were originated by a working group of the New Zealand Geotechnical Society. The idea for the working group came from a panel discussion ‘Geotechnical Seismic Design Standards’ which took place during the NZGS Biennial Symposium ‘Earthquakes and Urban…

Prototype Timber Catch Fence

Prototype Timber Catch Fence

ABSTRACT Design engineers often require rockfall protection structures that have relatively low impact energy resistance. Proprietary catch fences are available to the designer, but these can have capacities that greatly exceed the computed demand energy, and therefore may be overly expensive to construct. At a…

The use of SCPT and HVSR for site period and subsoil class estimation

The use of SCPT and HVSR for site period and subsoil class estimation

ABSTRACT NZS 1170.5:2004 provides a subsoil classification system of classes A to E, which are determined by specific criteria of soil or rock characteristics. The fundamental site period, T, is a key parameter in the classification system and is particularly useful in deciding between soil…

Validation of performance of polymeric geogrid in reinforced wall application

Validation of performance of polymeric geogrid in reinforced wall application

ABSTRACT Tensar uniaxial geogrids are molecularly oriented polymeric grid structures developed for tension resistant inclusions in soil walls and slopes. When stressed the geogrid must be capable of sustaining the load without rupture over the design life of the structure. The earliest use of high-density…

Lateral Deformations of a Pile Group due to Soft Soil Consolidation

Lateral Deformations of a Pile Group due to Soft Soil Consolidation

ABSTRACT During recent construction of an overpass bridge on soft ground, piled ground improvements were used to reduce the settlement of the bridge abutments and approach embankments. The piles were installed prior to construction of the approach embankments, under which significant consolidation settlement would occur…