CUTTER SOIL MIXING USED TO FACILITATE PIPELINE CONSTRUCTION, WYNYARD POINT, NZ.
ABSTRACT The Cutter Soil Mixing (CSM) method was used for in-situ mixing of contaminated reclaim ground at Wynyard Point, in the waterfront area of Auckland, to facilitate the installation of a large diameter outfall pipeline. A soil/cement block was formed by the CSM working…