Practical aspects of construction decisions for large wind turbine foundations
The Stage 3 expansion of the Tararua wind farm involved construction of 31 new turbines. Cyclical rocking under wind loading requires a strong foundation material and particularly high stiffness. Greywacke rock was the preferred founding material. This paper concentrates on the practical aspects of construction…