NZGS Symposium

Tauranga Harbour Link foundation pile construction and testing

The Tauranga Harbour Link project represents a major upgrade of the existing harbour crossing and approaches. It comprises a two lane incrementally launched bridge and major viaduct structure spanning road and rail links. This paper presents the details of the pile construction methodology using bentonite support fluid and presents a preliminary assessment of a load test on an instrumented preliminary pile.

Downloads
2-3.pdf
Published
09/01/2008
Collection
NZGS Symposium
Authors(s)
Matt Zame, Nick Wharmby, Paul Burton, Robert Hillier
Compilation
NZGS Symposium>18th NZGS Symposium
Link
N/A
Issue
1
Volume
34
Version
N/A
Location
New Zealand>Bay of Plenty
Type
Paper
Tags
N/A
ISBN
ISSN
0111-9532

Leave a Reply